Connecting an incoming power supply to the
grid or existing system is Synchronizing.
Frequency, phase angle and magnitude of
voltage shall be same for both incoming and running power supply. Normally an
indicating instrument will be provided to compare them. When they are satisfied
the meter will be at 12 O’clock position. The breaker shall be closed at this
condition.
No comments:
Post a Comment