Saturday 7 December 2013

142.What is Rundown?

During load ramping, the auxiliaries may not be able to meet the required load due to change in boiler conditions, aging of auxiliaries, etc. It is practiced to reduce the load and CMC demand slowly to a safe limit. This is known as Rundown.

No comments:

Post a Comment