Saturday 7 December 2013

127.When the gain of a control loop will need to change?

When the response of the Process is different at different conditions (eg: Oil or Coal or Gas firing, Load increase or decrease, No of Mills in operation, no of Fans/Pumps in operation etc) the control loop gain needs dynamic variation design.

No comments:

Post a Comment